- 50 KWp solar power plant at Sanand GIDC
- Lubi Panels, ABB Inverters, Polycab Cables
- Commissioned in March, 2019
- Grid connectivity Injection: 415 V (Torrent Power Limited)
- Scope included both metallic shed structures, stair cases, safety railing
- Tilt Design, South facing Aluminum Structure (for Metallic shed)
- Generation estimate basis trend : 1500 units/KWp/Year
- Softwares used: STAAD, PVSYST, Sketch-Up, Auto cad, Creo